Case Study

Enhancing HVAC Performance: Siemens Clamp-On Flow Meters Chosen For NYC Building Complex

Enhancing HVAC Performance: Siemens Clamp-On Flow Meters Chosen For NYC Building Complex

A commercial real estate corporation that owns, develops and operates premier properties in major North American cities was one of the earliest companies to recognize the benefit of individually metering tenants for their utility usage. When designing a prestigious building complex in New York City, the company sought a flow meter that would facilitate this task. After careful consideration of several options, the choice became clear: clamp-on ultrasonic flow technology from Siemens.

In any district cooling operation, a well-balanced system based on accurate and reliable flow and temperature measurement is extremely important. It is therefore imperative that every company regularly check the efficiency and performance of their cooling system, and be prepared to make drastic changes if required. Since heating and cooling costs account for more than half of a building’s total energy consumption, the extra time and cost may very well be worth the effort.

VIEW THE CASE STUDY!
Signing up provides unlimited access to:
Signing up provides unlimited access to:
  • Trend and Leadership Articles
  • Case Studies
  • Extensive Product Database
  • Premium Content
HELLO. PLEASE LOG IN. X

Not yet a member of ECM Connection? Register today.

ACCOUNT SIGN UP X
Please fill in your account details
Login Information
I'm interested in newsletter subscriptions.
ACCOUNT SIGN UP

Subscriptions

Sign up for the newsletter that brings you the industry's latest news, technologies, trends and products.

You might also want to:

Siemens Process Instrumentation